First stage I-IV.2026 2/3/4 stages - II.2026-II.2027
construction stages:
42psc
Various module modifications with module areas ranging from 360 m2 to 1499 m2
TOTAL quantity OF BLOCKS:
138
from the MKAD, direct entrance/exit to Novoryazanskoye Shosse. r.p. Tomilino, Moscow Region
location:
8 km
Building area:
203242 m2
Land area:
39,6 Ha
The new format is LIGHT INDUSTRIAL, a unified design code for blocks, a well-designed interior space, united by the concept of a modern technology park. A new benchmark in commercial real estate.
PSC «TOMILINO-2» LIGHT INDUSTRIAL
PROJECT:
PSC «TOMILINO-2» LIGHT INDUSTRIAL
UNIQUE LOCATION
8 km from the Moscow Ring Road along Novoryazanskoye Highway Arrival and departure in the direction of Moscow
TRANSPORTATION ACCESSIBILITY 3 min. walk to the bus stop 20 min. from MCD-3 Tomilino by public transport 20 min. from m. Kotelniki by public transport 10 min. from the MKAD by car
FOURTH STAGE: IV.2026-II.2027 SQUARE: 50000 m2
THIRD STAGE: III.2026-II.2027 SQUARE:50000 m2
SECOND STAGE: II.2026-I.2027 SQUARE: 50000 m2
FIRST STAGE: I-IV. 2026 SQUARE: 50000 m2
CLASS: B+ height to the trusses: 10.5 m warehouse at the mark: +1.100 Area: 1494 m2 | 746 m2 Load warehouse: 6 t/m2
D. BYAKONTOVO, GOR. OKR. PODOLSK 11 km from the MKAD along SIMFEROPOLSKOYE SH. 8 km to Podolsk Nearest settlements: Podolsk, Domodedovo, Shcherbinka, Butovo